|
CBS Television - Los Angeles, CA
Challenge:
Replacement of old brick-type boilers with six (6) Thermal Solutions EVH-2000 condensing boilers as part of an Energy Conservation Project. The project will later be expanded with another two boilers. Vented by a new AL29-4C material stack material within the existing stack.
Solution:
Installation of a CASV450 Chimney Automation System to allow for
common venting of Cat. IV appliances. Sized to provide stack size reduction and allow for future expansion.
Contractor:
PPC Air-conditioning, Cypress, CA.
Engineer:
CBS
Installation Year: 2002
More Installations |
|