Heinz Field - Pittsburg, PA
Challenge:
Venting of eight (8) Thermal Solution EVH-2000 boilers for the field heating systems and two (2) A.O. Smith 4,000MBH Boilers for domestic water heating system. The venting system consisted of long horizontal and vertical runs with many elbows.
Solution:
Installation of a CASV450-2 system for the field heating system, a
CASV 450-4 for the domestic water heaters and two (2) additional CASV315’s for water heaters on other concourse levels.
Contractor:
SSM Industries, Pittsburgh, PA .
Installation Year: 2001